|
|

Projects
Projects implemented by OOO “Kapitalstroy” for the period from 2006 to 2010.
|
№
|
Project title
|
Technical data
|
Volume of works in cu.m.
|
|
1.
|
Administration building in the city of Nizhniy Novgorod
|
Ø620, L=16,2 l.m.
|
1098
|
|
2.
|
First stage of rehabilitation of the historical building for the Business & Cultural Center in Moscow – 4 Podkopaevskiy pereulok
|
Ø720, L=10-12 l.m.
|
262,8
|
|
3.
|
Office and dwelling complex in Moscow – the 4th Dobryninskiy pereulok
|
Ø620, L=10 l.m.
|
160,7
|
|
4.
|
Living complex in Moscow – 20 Zemledelcheskiy pereulok
|
Ø620, L=10-15 l.m.
|
834,1
|
|
5.
|
Multifunctional complex with underground parking in Moscow – 39 Leningradskiy avenue
|
Ø620, L=27 l.m.
Ø1020, L=20 l.m.
Ø800, L=24 l.m.
|
1442,3
|
|
6.
|
Reconstruction of Leningradskiy avenue from Begovaya street to the SOKOL metro station due to the removing tramways
|
Ø750, L=9-15 l.m.
Ø1000, L=14-16 l.m.
|
919,8
|
|
7.
|
Dwelling house in Krasnogorsk city of Moscow Oblast
|
Ø620, L=12 l.m.
|
612
|
|
8.
|
Third stage of construction of the covered trade center “MITINO RADIO MARKET” in Moscow
|
Earth moving works for changing top soil layers of the area.
|
554,7
|
|
9.
|
Three living houses with the covered parking lot in Moscow – 20-22 Dubninskaya street
|
Ø620, L=16 l.m.
Ø1020, L=16 l.m.
|
2893,9
|
|
10.
|
Reconstruction of the high voltage electric line 119 kV (Novobratzevo – Voikovskaya) (Voikovskaya – Svoboda str.) – tunneling section crossing the railway
Tunneling section of the high voltage electric cables 220 kV at the section between Izhorskaya street and Dmitrov chassee for the connection of Dubninskaya substation to the Heating Electric Center Block #21.
|
Ø750, L=15-20 l.m.
Ø1200, L=33 l.m.
|
782,4
|
|
11.
|
Main entrance zone to the State-Protected Museum of the State Institution of Culture “TZARITZYNO” in Moscow. Visiting Center “Tzaritzino”, Moscow – 1 Dolskaya street.
|
Ø620, L=11 l.m.
|
489
|
|
12.
|
Construction of the bridge over SURA river for evacuation of people from the site of the chemical weapons destruction in Penza Oblast, Leonidovka village.
|
Ø750, L=25,5 l.m.
Ø1200, L=30 l.m.
|
2659
|
|
13.
|
Construction of the anti-landslide structures with drainage systems, sloping and surface stabilization within the holiday center “Yantar” at the Makarovo village of Moscow Oblast.
|
Ø1200, L=20 l.m.
|
1200
2000 of the concrete supporting wall
|
|
14.
|
Cargo ramp of the international airport terminal “Sheremetyevo-1”. Extension of the Terminal-1.
|
Ø750, L=2,5-9,5 l.m..
|
328,8
|
|
15.
|
Complex of dwelling houses with service blocks and the underground parking lot in Moscow – at 2, 4, 4a Popov pereulok and at 7-1 Rusakovskaya naberezhnaya.
|
Ø750, L=10,4-11,4 l.m.
Ø800, L=24 l.m.
|
630,6
|
|
16.
|
Moscow techno-park NAGATINO – ZIL. First stage of construction in Moscow - at the western part of Nagatino flood-lands of the Moskva river. Building 1-2B.
|
Ø1000, L=30,2 l.m.
|
474
|
|
17
|
Administration complex and the shopping center with underground parking lot in Moscow – 15 Tzvetnoy boulevard
|
Ø1200, L=25 l.m.
|
549,6
|
|
18.
|
Fly-over of the technological pipelines at the section of the Thermal Station of the Moscow Business Center (Moscow City), Ermakova Roscha street.
|
Ø620, L=11 l.m.
|
171,6
|
|
19.
|
Car shopping center with garages in Moscow – 2-4 Banniy pereulok.
|
Ø600, L=6-15 l.m.
Ø800, L=21 l.m.
|
1810,1
|
|
20.
|
Living house with the underground parking lot in Moscow – 6-1 Maliy Kakovinskiy pereulok.
|
Complex of works
|
Complex of works
|
|
21.
|
Hotel with administration and business center in Moscow Oblast – Kirov street of Khimki city, close to the NOVATOR football stadium.
|
Ø600, L=15 l.m.
|
1327,5
|
|
22.
|
MERIINSKIY Theater in St.Petersburg, 31-А Dekabristov street.
|
Ø1000, L=30,6 l.m.
|
2735,8
|
|
23.
|
“Chambers № 2, № 1, № 3 and № 9.” Covered high voltage electric lines 220 kV at the section between Substation OCHAKOVO and Substation City-2 under the Moscow Circular railway, in the area of Prichalniy proezd in Moscow
|
Ø750, L=115-20 l.m.
Ø1200, L=33 l.m.
|
8007,8
|
|
24.
|
Railway two-level crossing at the railway line SAVELOVSKIY Terminal – Airport Sheremetyevo in Moscow.
|
Ø1200, L=30 l.m.
|
Cast-in-place piles --4435,7
Foreshaft-307
|
|
25
|
Swimming pool in Moscow – 77a Bolshaya Akademicheskaya street
|
Ø620, L=9,1l.m.
|
346,7
|
|
26.
|
Warehouse for the reconstructed administration building and the boiler-house construction in Moscow – 2 Volokolamskoye chaussee
|
Ø620, L=6-15 l.m.
Ø600, L=6-9 l.m.
|
1984,2
|
|
27.
|
Moscow city center for the cable TV control – Moscow Micro region 29-k 15 3rd Dorozhniy proezd.
|
Construction of the flat drainage, hydro isolation and ferroconcrete foundation slab.
|
Construction of the flat drainage, hydro isolation and ferroconcrete foundation slab.
|
|
28.
|
Construction of the sheet piling for the borrow pit in Moscow – District 22-23 block 6 New Cheremushki.
|
Ø300, L=17 l.m.
Ø420, L=18-21 l.m.
|
Sheet piling 7974 l.m.
|
|
29.
|
Educational/Administrative Block of the Moscow State Mining University – 6 Leninskiy avenue.14-15-16,19 buildings
|
Ø620, L=10,2-16 l.m.
Ø1000, L=17-32 l.m.
|
3961,9
|
|
30.
|
Flyover pedestrian crossing in Moscow – Lublinskaya street at the TEKSTILSCHIKI metro station.
|
Ø620, L=17 l.m.
Ø250, L=8,7 l.m.
|
Construction of struts and cross-bars, plank safety fencing, monolithic grillages, Cast-in-place piles - 414,2
|
|
31.
|
25-storey living house with the underground parking lot in Moscow – 49a Kronshtadtskiy boulevard
|
Ø620, L=17 l.m.
|
464,1
|
|
32.
|
Garage complex with the Service center, Administration block and car shopping center in Moscow – 20 – 22 Berezhkovskaya naberezhnaya.
|
Ø620, L=13,2 l.m.
|
99
|
|
33.
|
Installation of the screen plane and the landing craft in the water area of the Khimki water reservoir (Second stage of creation of the Museum complex of the Paratroopers History) in the Khimki city of the Moscow Oblast.
|
Ø750, L=17 l.m.
|
67,7
|
|
34.
|
Individual living house with the underground parking in Moscow – 27-1 Babel street.
|
Ø750, L=4-14 l.m.
|
2306,2
|
|
35.
|
Hotel and Business center in Moscow – 1 V.Kozhina street.
|
Ø750, L=14 l.m.
|
212
|
|
36.
|
Construction of the 3rd main track at the railway section Moscow Passenger Kurskaya Station – Kuskovo Station in Moscow.
|
Ø1200, L=13,5-20 l.m.
|
662,2
|
|
37.
|
Theater center “Cherry Garden” in Moscow - 10/31 Malaya Sukharevskaya square.
|
Ø750, L=26,4 l.m.
|
690,4
|
|
38.
|
Reconstruction of the Big Novorossiysk Tunnel of the Northern Caucasus Railway in Novorossiysk city.
|
Ø1200, L=15 l.m.
|
271,5
|
|
39.
|
Reconstruction of the Dmitrovskoye chaussee from the Moscow Circular Railway to the Korovinskoye chaussee in Moscow.
|
Ø1200, L=31 l.m.
|
1986,4
|
|
40.
|
Serebryanskiy Cement Plant in the Ryazan Oblast
|
Ø1000, L=19,5-22 l.m.
Ø1200, L=14-17,5 l.m.
|
2812,9
|
|
41.
|
Intersection of Leningradskoe chaussee with Golovinskoye chaussee «Development of the water stadium “Dinamo” territory», Moscow
|
Ø800, L=6-7 l.m.
|
322
|
|
42.
|
Volgograd city, Dzerzhinskiy region, Living house № 1, in micro region № 132.
|
Ø1000, L=20 l.m.
|
3842
|
|
43.
|
Section of the 3rd transport Ring Road from Autozavodskiy bridge to the tunnel “Moscow city” under Kutuzovskiy avenue. Strengthening of the sewage purification structures’ banks in the region of the Moscow Business Center «Moscow city», Moscow.
|
Ø620, L=17 l.m.
|
592,6
|
|
44.
|
Hotel and Business center in Moscow – 1 V.Kozhina street.
|
Ø1000, L=15,2 l.m.
|
1455,7
|
|
45.
|
Construction of the underground intersection at the 44th km of the Northern Caucasus Railway within the station “Essentuki”, Essentuki city.
|
Ø750, L=8-11l.m.
|
622,2
|
|
46.
|
«The pit of the pressured water-ways» - The pit of the supporting walls at the water intake in the city of Sergiev Posad, Moscow Oblast.
|
Ø1200, L=20м l.m.
|
5186
|
|
47.
|
Living houses with underground parking lot and the electric transformer substation in Moscow – 25 Korshurnikova street.
|
Ø600, L=12-15 l.m.
|
3501,6
|
|
48.
|
Main Block. Dry ash hopper of the Kashira Hydro Electric Station. Starting complex of the Energy Block № 3 of the Kashira Hydro Electric Station – Kashira city of the Moscow Oblast, 4 Sovetskiy proezd.
|
Construction of the pile foundation
|
Construction of the pile foundation
|
|
49.
|
Construction of the football stadium at the western part of Krestovskiy Peninsula in St.Petersburg.
|
Ø880, L=28 l.m.
Ø1500, L=30,2 l.m.
|
1399,5
|
|
50.
|
Approaching ramp to the Terminal “Sheremetyevo-3”. Construction of the 2-level intersection over Mezhdunarodnoye chaussee, Moscow Oblast.
|
Ø750, L=15 l.m.
|
135
|
|
51.
|
Reconstruction of the Big Novorossiysk Tunnel of the Northern Caucasus Railway. Existing Big Novorossiysk Tunnel. Ferroconcrete bridge 11,5+16,5 m, Novorossiysk city.
|
Ø1200, L=6 l.m.
|
54,2
|
|
52.
|
Reconstruction of the engineering structures. Small and midsize bridges on the Northern Caucasus Railway. Culvert at km 1292 at the section Lozovaya – Rostov. Supporting wall.
|
Ø750, L=15 l.m.
|
485,1
|
|
53.
|
Cement plant in the Tula Oblast, Aleksin region.
|
Ø1200, L=30 l.m.
|
1023,40
|
|
54.
|
Highway М-4 «DON» from Moscow via Voronezh, Rostov, Krasnodar to Novorossiysk. From km 225,6 to km 414,7 at the section of Efremov city bypass. Stage № 7. Bridge over the narrow gorge Popov Verkh in the Efremov city.
|
Ø1500, L=10 l.m.
|
1108,48
|
|
55.
|
Bridge over Krasivaya Mecha river on the highway М-4 «DON» at the section of the Efremov city bypass.
|
Ø1500, L=10 l.m.
|
554,24
|
|
56.
|
Structure safeguard of the left wall for the Volokolamskiy Tunnel. Transport intersection of Leningradskoye chaussee and Volokolamskoye chaussee at the metro station SOKOL, Moscow.
|
Ø1000, L=14-16 l.m.
|
579,70
|
|
57.
|
Combined (motorway and railway) road Adler – mountain ski resort “Alpika-service” with construction of the continuous second railway track at the section Sochi – Adler – Veseloye (surveying, designing and constructing works).
|
Ø1200, L=8-30 l.m.
|
32540,79
|
| 58 |
Compressor Station “Portovaya” (1st stage of the Northern European Gas Pipeline project implementation) – section Gryazovetz – Vyborg in the Viborg city.
|
Ø620, L=7-15 l.m.
|
1804 |
| 59 |
Automobile road, airport Knevichi – Senatornaya station at the section of the automobile road M-60 “Khabarovsk – Vladivostok”, at the section km 747 – 750 (Stage1), pedestrian bridge at the 166+93 stationing.
|
Ø1200, L=8-30 l.m. |
164,95 |
| 60 |
“Reconstruction of the bridge crossing over river Osinovka at the 169th km of the automobile road M-60 “Ussuri – from Khabarovsk to Vladivostok”.
|
Ø1200, L=8-30 l.m. |
925 |
| 61 |
Reconstruction of the small and midsize engineering structures of the Western Siberian Railway. Pedestrian bridgeat the station Barabinsk”.
|
Ø1500, L=10,4 l.m. |
515,2 |
| 62 |
“Construction of the bridge crossing to the Russkiy Island over the Eastern Bosfor channel in Vladivostok “Bridge СВСиУ”. Lateral launching of the metallic part of the stiffening girder. Reloading birth at the Russkiy Island. Retaining walls ПС1.ПС2 Piling foundation”.
|
Ø1500, L=8,5-16,5 l.m. |
1340 |
| 63 |
“Approaches to the Western Portal ПК 1824+44-ПК 1896+00" being part of the complex investment project “Reconstruction of the section OUNE – VYSOKOGORNAYA with construction of the new Kuznetzovskiy tunnel at the section of Komsomolsk-on-Amur – Sovetskaya Gavan”.
|
Ø1500, L=8-30 l.m. |
500 |
| 64 |
“Bridge over the river Bogatoe ПК 129+99”.
|
Ø1500,
L=18,04-18,54 l.m. |
327 |
| 65 |
“Organisation of the passenger traffic between Vladivostok and the airport Knevichi. Railwaybridge 44x77x44 metersatthepoint 19+95,27”.
|
Ø1500, L=10 l.m. |
1214,3 |
| 66 |
"Construction of the flyover No.2 at the point 96+29 at the station Vesennaya of the highway M-60 Khabarovsk – Vladivostok, section km 733,5 – km 747, Vladivostok city”. |
Ø1500, L=8-30 l.m. |
3500 |
| 67 |
“ Reconstruction of the bridge crossing over Osinovka river at the 619th km of the highway M-60 “USSURI” from Khabarovsk to Vladivostok”. |
Ø1500, L=12-22,4 l.m. |
1064 |
| 68 |
Oil pipeline crossing with the railway Golubovka – Ekaterinovka and with the automobile road Nakhodka – Lazo at ПК47418+50 - ПК47437+5". |
Ø800, L=30 l.m. |
290,4
Foreshaft - 33,1
|
| 69 |
"Reconstruction of the municipal highway with the regulated traffic at the section Station Sanatornaya – Bridge over Zolotoy Rog Bay, Bridge crossing over the river Pionerskaya". |
Ø1500, L=8-30 l.m. |
1300 |
| 70 |
“Automobile road Alagir (Automobile road “Caucasus” Nizhniy Zaramak up to the border with the Republic of Georgia) Tunnel 86+300” Republic Northern Ossetia – Alania.
|
Ø600-900 , L=4,1-11 l.m. |
1522 |
| 71 |
Bridge on the pile foundation at km 970. Point 10. Railway Abakan – Taishet. Krasnoyarskiy Kray.
|
Ø1500, L=10 l.m. |
141 |
| 72 |
"High voltage power line 220 kV. Zeleniy Ugol – Russkaya with crossing over the Eastern Bosfor Channel". |
Ø1500, L=30,9-30,2 l.m. |
1110 |
Works under execution by OOO “Kapitalstroy”
|
№
|
Project title
|
Period of works
|
Volume of works in cu.m.
|
|
1
|
Combined (motorway and railway) road Adler – mountain ski resort “Alpika-service” with construction of the continuous second railway track at the section Sochi – Adler – Veseloye (surveying, designing and constructing works).
|
01.01.2009
|
72000
|
|
2
|
“Reconstruction of the engineering structures. Small and midsize bridges of the Privolzhskaya Railway. Reconstruction of the flyover at km 1071 ПК1 of the section Gryazi – Volgograd”.
|
17.02.2011г. |
260
|
|
3
|
“Organisation of the passenger traffic between Vladivostok and the airport Knevichi with construction of the new railway Post 13 km – airport Knevichi. “Covered High Platform”.
|
10.03.2010г. |
4441,8
|
| 4 |
“Main Gas Pipeline Sakhalin – Khabarovsk – Vladivostok. Linear part, section km 925,9 – km 1453,5”
|
18.03.2011 |
3500 |
| 5 |
| “Reconstruction of the section OUNE – VYSOKOGORNAYA with construction of the new Kuznetzovskiy tunnel at the section of Komsomolsk-on-Amur – Sovetskaya Gavan”. |
|
01.09.2010 |
3546,38 |
|
|
|
| 2004-2012 © Kapitalstroy |
8 (499) 940-93-40
8 (499) 940-93-40 |
Offices 19, 22 - Block 1, 62 Usacheva street, Moscow 119048, Russia |
Development site
 |
|
|
|